Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Dec 16, 2023     Alternator #2 wiring - (2 hours)       Category: Avionics
Cut the #8 AWG wire to length for the backup alternator and attached a 5/16” eyelet to secure it to the 40A ANL. Added some heat shrink for strain relief. Ran a 18awg wire from the #3 post on the B&C voltage regulator to the post on the ammeter shunt. Will cut to length and attach to the shunt once I receive the 1/4” eyelet for that size wire.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.